ASOE Logo

Project Pre-Qualification Questionnaire

Please complete the form below. Required fields are marked with an asterisk.

Client Details

Organisation

Job Title

Name and Surname

Email

Phone Number

Project

Pipe Details

1. Pipe Internal Diameter (mm)

Please upload a photo showing how the diameter was measured (if possible).

Accepted: JPEG, PNG, HEIC, PDF, Word, Excel and common image file types.

2. Pipe Outside Diameter (mm)

Please upload a photo showing how the diameter was measured (if possible).

Accepted: JPEG, PNG, HEIC, PDF, Word, Excel and common image file types.

3a. Host Pipe Material

Please select the correct host type. If the host is a blend, select multiple options. If not listed, choose "Other" and provide details in section 3b.

Please select at least one Host Pipe Material.

3b. Host Pipe Material

“Please provide details of the host material. Include any known lining (type, material,date of installation), the overall condition of the system, and any observed or suspected defects.”

4. Section Details: Length, Direction Changes and Pressure

e.g. 50m with 4 × 45° bends @ 3 bar, 120m straight @ 2.5 bar

5. Total Length

6. Fluid / Type of Chemicals or Gases Present

(e.g. if this is a hydrocarbon like diesel, what is the diesel lab analysis (CoQ) showing sulfur ppm and total aromatic %? If it is process water list all chemicals, TDS and full analyses of the product being conveyed. If it is district heating, what additives are in the water?)

7. Maximum % and Average %

Please list chemical percentages and concentrations.

8a. Fluid Temperature

Average

8b. Fluid Temperature

Min

8c. Fluid Temperature

Max

9. Flow Volume

Average m3/hour

10. Is there Vacuum / Negative Pressure?

11. Depth of the Line

Please upload a photo demonstrating how the depth of the line was measured, including the measuring method used (if possible).

Accepted: JPEG, PNG, HEIC, PDF, Word, Excel and common image file types.

12. Is there a Water Table Present?

Select the most appropriate option.

13. Bends (Quantity & Radius)

e.g. 45degree, 90degree. Will you excavate 90degree bends? Exact bend geometry is required.

14. Couplings (Quantity)

Always 2 per section/pull.

15a. Coupling Material / Type

Please select the correct material type. If not listed, choose "Other" and provide details in section 15b.

Please select at least one Coupling Material / Type.

15b. Coupling Material / Type

Please provide details of the coupling material/type if "Other" was selected in 15a.

Site / Installation

16. Reel Type Preference

Choose the most suitable option based on site footprint and handling requirements.

17. Installation Kit / Hydraulic Press

Do you wish to rent or include this in the first job?

18. Site Support Required?

YES (standard for first-time training).

19. Drawings / Diagrams

If available, please upload any drawings or diagrams. If drawings are not available, please indicate accordingly.

Accepted: JPEG, PNG, HEIC, PDF, Word, Excel and common image file types.
Please select at least one Drawings / Diagrams option.

20. Best Port for Shipping

Assessment / History

21. Does the line run full permanently?

22. Do you have a survey of the pipe?

Please include the history of why the pipe failed and why it needs to be rehabilitated.

23a. What condition assessment do you have?

Select multiple options if applicable. If "Other" is selected, provide details in 23b.

Please select at least one Condition Assessment option.

23b. Additional Condition Assessment

Please provide details if "Other" was selected in question 23a.

Accepted: JPEG, PNG, HEIC, PDF, Word, Excel and common image file types.
Optional: one audio file only.